# TrakQR Implementation Tasks > This file tracks implementation progress. Update status as work completes. ## Status Legend - [ ] Not started - [~] In progress / Partial - [x] Complete --- ## Phase 1: Foundation (Complete) ### Database & Models - [x] PostgreSQL setup - [x] EF Core configuration - [x] User entity - [x] Workspace entity - [x] Project entity - [x] ShortLink entity (model only) - [x] QRCodeDesign entity (model only) - [x] Domain entity (model only) - [x] Event entity (model only) - [x] Asset entity (model only) ### Authentication - [x] User registration endpoint (`POST /auth/register`) - [x] User login endpoint (`POST /auth/login`) - [x] JWT token generation - [~] Forgot password endpoint (endpoint exists, email TODO) - [~] Reset password endpoint (endpoint exists, needs completion) - [ ] Email verification flow ### Workspaces & Projects - [x] Create workspace (`POST /workspaces`) - [x] List workspaces (`GET /workspaces`) - [x] Get workspace (`GET /workspaces/{id}`) - [x] Update workspace (`PUT /workspaces/{id}`) - [x] Delete workspace (`DELETE /workspaces/{id}`) - [x] Create project (`POST /workspaces/{id}/projects`) - [x] List projects (`GET /workspaces/{id}/projects`) - [x] Get project (`GET /workspaces/{id}/projects/{id}`) - [x] Update project (`PUT /workspaces/{id}/projects/{id}`) - [x] Delete project (`DELETE /workspaces/{id}/projects/{id}`) - [x] Auto-create default workspace on signup - [x] Ownership verification / access control ### Testing Infrastructure - [x] ApiWebApplicationFactory for integration tests - [x] Project endpoint tests - [x] Workspace endpoint tests - [x] Link endpoint tests --- ## Phase 2: Core Link Features (Next Priority) ### Short Link CRUD - [x] Create short link endpoint (`POST /workspaces/{id}/links`) - Custom slug or auto-generate - URL validation - Title (optional) - Project assignment (optional) - Domain selection (default domain initially) - [x] List short links (`GET /workspaces/{id}/links`) - Filter by project - Filter by status - Pagination (not yet) - [x] Get short link (`GET /workspaces/{id}/links/{id}`) - [x] Update short link (`PUT /workspaces/{id}/links/{id}`) - Update destination URL - Update title - Enable/disable (status) - Set expiration date - Set password protection - [x] Delete short link (`DELETE /workspaces/{id}/links/{id}`) - [x] Short link tests (15 tests) ### Public Redirect Endpoint - [x] `GET /{slug}` redirect endpoint - Resolve domain + slug to destination - Check link exists - Check link is active - Check not expired - Check password (if protected, return 401 with X-Password-Required header) - Log event (async, non-blocking) - TODO Phase 3 - Return 302 redirect - [x] Default domain configuration (using null domain for now) - [x] Password-protected link handling (`POST /{slug}` with password) - [x] Redirect endpoint tests (10 tests) --- ## Phase 3: Event Tracking & Analytics ### Event Logging - [x] Event logging service (`IEventTrackingService`) - IP hashing (privacy) ✓ - User agent parsing (device type) ✓ - GeoIP lookup (country) - TODO: integrate GeoIP database - Referrer capture ✓ - Dedupe key generation (30-min window) ✓ - [x] Click event recording (from redirect) - [~] Scan event recording (from QR) - ready, needs QR endpoints - [x] Async/background event processing (fire-and-forget) - [x] Event tracking tests (5 tests) ### Analytics Endpoints - [x] Workspace analytics (`GET /workspaces/{id}/analytics`) - Total clicks/scans ✓ - Unique visitors ✓ - Time series data ✓ - Top links breakdown ✓ - Device breakdown ✓ - Referrer breakdown ✓ - [x] Link analytics (`GET /workspaces/{id}/links/{id}/analytics`) - Per-link stats ✓ - Referrer breakdown ✓ - Device breakdown ✓ - Geo breakdown - TODO: integrate GeoIP database - [x] Time filters (24h, 7d, 30d, all-time) - [x] Analytics endpoint tests (9 tests) --- ## Phase 4: QR Code Designer ### QR Code Generation - [x] QR code generation service (`IQRCodeGeneratorService`) - Uses QRCoder library ✓ - Support different error correction levels (L/M/Q/H) ✓ - Quiet zone configuration ✓ - PNG and SVG output ✓ - [x] QR code design model integration - Foreground/background colors ✓ - Module shapes (square) - more shapes TODO - Eye shapes - TODO - Logo embedding - TODO (needs asset upload) ### QR Code Endpoints - [x] Create QR design (`POST /workspaces/{id}/qrcodes`) - [x] List QR designs (`GET /workspaces/{id}/qrcodes`) - [x] Get QR design (`GET /workspaces/{id}/qrcodes/{id}`) - [x] Update QR design (`PUT /workspaces/{id}/qrcodes/{id}`) - [x] Delete QR design (`DELETE /workspaces/{id}/qrcodes/{id}`) - [x] Preview QR (`GET /workspaces/{id}/qrcodes/{id}/preview`) - returns data URL - [x] Export QR as PNG (`GET /workspaces/{id}/qrcodes/{id}/export?format=png&size=512`) - [x] Export QR as SVG (`GET /workspaces/{id}/qrcodes/{id}/export?format=svg`) - [x] QR code endpoint tests (12 tests) ### Asset Management (for logos) - TODO - [ ] Upload asset endpoint (`POST /workspaces/{id}/assets`) - [ ] List assets (`GET /workspaces/{id}/assets`) - [ ] Delete asset (`DELETE /workspaces/{id}/assets/{id}`) - [ ] Asset storage (local/S3) --- ## Phase 5: Domain Management ### Custom Domains - [ ] Add domain (`POST /workspaces/{id}/domains`) - [ ] List domains (`GET /workspaces/{id}/domains`) - [ ] Delete domain (`DELETE /workspaces/{id}/domains/{id}`) - [ ] Domain verification flow - Generate verification token - Check DNS TXT record - Mark as verified - [ ] Domain status management (Pending → Verified → Active) --- ## Phase 6: Frontend Dashboard ### Authentication UI - [ ] Login page - [ ] Registration page - [ ] Forgot password page - [ ] Password reset page - [ ] Auth state management ### Dashboard - [ ] Workspace switcher - [ ] Dashboard home (overview stats) - [ ] Navigation/sidebar ### Link Management UI - [ ] Links list view - [ ] Create link modal/page - [ ] Edit link modal/page - [ ] Link details with analytics ### QR Designer UI - [ ] QR designer page - [ ] Color pickers - [ ] Shape selectors - [ ] Logo upload - [ ] Live preview - [ ] Export buttons ### Analytics UI - [ ] Charts (time series) - [ ] Stat cards - [ ] Breakdown tables (referrer, geo, device) --- ## Phase 7: Production Readiness ### Security & Performance - [ ] Rate limiting - [ ] Input sanitization - [ ] CORS configuration - [ ] Request logging - [ ] Error handling middleware ### Email System - [ ] Email service integration (SendGrid/SES/etc.) - [ ] Email verification emails - [ ] Password reset emails - [ ] Email templates ### Plan & Quotas - [ ] Usage tracking - [ ] Plan limits enforcement - Free: 50 links, 1 workspace - Pro: 5,000 links, 5 workspaces - Business: Unlimited - [ ] Upgrade prompts --- ## Phase 8: Post-MVP Features ### Payments (Stripe) - [ ] Stripe integration - [ ] Checkout flow - [ ] Subscription management - [ ] Webhook handling ### Advanced Features - [ ] UTM builder - [ ] Link groups/campaigns - [ ] Bulk link creation - [ ] API keys for external access - [ ] Webhooks for events --- ## Current Focus **Completed: Phase 2 + Phase 3 + Phase 4** - Short Link CRUD (5 endpoints, 15 tests) - Public Redirect Endpoint (2 endpoints, 10 tests) - Event Tracking Service (click logging, dedupe, device detection) - Analytics Endpoints (2 endpoints, 9 tests) - QR Code Designer (7 endpoints, 12 tests) **Total: 81 tests passing** **Next up: Phase 5 - Domain Management** or **Frontend Dashboard** Completed: 1. ~~Create short link endpoint with auto-slug generation~~ ✓ 2. ~~List/Get/Update/Delete short link endpoints~~ ✓ 3. ~~Public redirect endpoint (`GET /{slug}`)~~ ✓ 4. ~~Password redirect endpoint (`POST /{slug}`)~~ ✓ 5. ~~Event logging (basic click tracking)~~ ✓ 6. ~~Analytics endpoints~~ ✓ 7. ~~QR code generation and designer~~ ✓ --- ## Notes - Backend uses FastEndpoints (not traditional MVC controllers) - Vertical slice architecture: features in `src/api/Features/{Feature}/` - All endpoints require JWT auth except public redirect - Default domain: use app's domain until custom domains implemented